Section 74:12:02:15 - Vertical deviation test

When a well is drilled or deepened, it must be done so that the deviation from the vertical distance between the top and bottom of the hole is at all times a minimum. The secretary may require a test to determine the deviation from the vertical and may require the hole to be straightened, unless it is permitted as a directional or horizontal well.

S.D. Admin. R. 74:12:02:15

38 SDR 117, effective 1/12/2012.

General Authority: SDCL 45-9-11, 45-9-13.