Nev. Admin. Code § 455C.268

Current through November 8, 2024
Section 455C.268 - Qualifications of attendant

A person is qualified to attend a power boiler or a high-pressure, high-temperature water boiler, where such attendance is required pursuant to NAC 455C.274, if the person has:

1. The technical training, experience and knowledge necessary to start, operate and shut down the boiler; and
2. A high school diploma or the equivalent and at least the following number of days or equivalent hours of documented experience in the operation of boilers for the size of the boiler being operated:
(a) For up to 299 boiler horsepower, 182 days.
(b) For 300 to 499, inclusive, boiler horsepower, 365 days.
(c) For 500 to 1,000, inclusive, boiler horsepower, 547 days.
(d) For more than 1,000 boiler horsepower, 1,095 days.

Nev. Admin. Code § 455C.268

Added to NAC by Div. of Industrial Relations by R101-02, eff. 12-15-2004

NRS 455C.110