25 Ind. Admin. Code 2-4-3

Current through October 31, 2024
Section 25 IAC 2-4-3 - Subcontractors' prequalification as precondition to starting work

Authority: IC 4-13-2-9; IC 4-13.6-3-1

Affected: IC 4-13.6; IC 5-16-1-2

Sec. 3.

Any subcontractor proposing to do work that has a valuation of one hundred fifty thousand dollars ($150,000) or more shall also be prequalified as set out in section 2 of this rule before the subcontractor begins any work on the site.

25 IAC 2-4-3

Indiana Department of Administration; Public Works Division Sec D,3; filed Feb 29, 1972, 4:10 p.m.: Rules and Regs. 1973, p.4; filed Feb 3, 1982, 1:05 p.m.: 5 IR 511; readopted filed Nov 20, 2001, 9:30 a.m.: 25 IR 1265; filed Nov 14, 2007, 11:10 a.m.: 20071212-IR-025060515FRA; readopted filed Oct 18, 2013, 1:38 p.m.: 20131113-IR-025130403RFA
Readopted filed 11/4/2019, 3:40 p.m.: 20191204-IR-025190494RFA