Authority: IC 4-13-2-9; IC 4-13.6-3-1
Affected: IC 4-13.6
Sec. 4.
Any prime contractor or subcontractor doing work for the State is required to complete at least (20%) twenty percent of the work, measured in dollars of the total contract price, with his own forces.
Indiana Department of Administration; Public Works Division; 25 IAC 2-4-4; filed Feb 3, 1982, 1:05 pm: 5 IR 511; readopted filed Nov 20, 2001, 9:30 a.m.: 25 IR 1265; readopted filed Aug 26, 2008, 8:31 a.m.: 20080910-IR-025080549RFA; readopted filed Oct 18, 2013, 1:38 p.m.: 20131113-IR-025130403RFAReadopted filed 11/4/2019, 3:40 p.m.: 20191204-IR-025190494RFAReadopted filed 10/25/2024, 12:07 p.m.: 20241120-IR-025240218RFA