Authority: IC 4-13-2-9; IC 4-13.6-3-1
Affected: IC 4-13.6
Sec. 2.
A contractor desiring to perform construction work for the division must, before being allowed to bid on projects with a valuation of one hundred fifty thousand dollars ($150,000) or more:
(1) apply to the certification board supplying all of the pertinent information required by the certification board; and(2) obtain their prequalification approval; as set out in this article. A contractor shall not be considered to have legally received plans on a particular project having a valuation of one hundred fifty thousand dollars ($150,000) or more without being prequalified by the certification board.Indiana Department of Administration; Public Works Division Sec D,2; filed Feb 29, 1972, 4:10 p.m.: Rules and Regs. 1973, p. 4; filed Feb 3, 1982, 1:05 p.m.: 5 IR 511; readopted filed Nov 20, 2001, 9:30 a.m.: 25 IR 1265; filed Nov 14, 2007, 11:10 a.m.: 20071212-IR-025060515FRA; readopted filed Oct 18, 2013, 1:38 p.m.: 20131113-IR-025130403RFAReadopted filed 11/4/2019, 3:40 p.m.: 20191204-IR-025190494RFAReadopted filed 10/25/2024, 12:07 p.m.: 20241120-IR-025240218RFA