Secondary transmission mains shall be constructed as part of the southwest pipeline project, as provided in the engineering preliminary design final report for the southwest pipeline project, state water commission project no. 1736, dated September 1982, except as provided in section 61-24.3-03.
N.D.C.C. § 61-24.3-06