The intake structure to be utilized for the withdrawal of water from the water source for the southwest pipeline project shall be determined by the commission, as in the judgment of the commission the interests of the state and water user entities of the southwest pipeline project are best served. In making its determination on the selection of the intake structure, the commission shall consider, among other things, cost, project stability, capacity and ability to withdraw water, and flexibility in delivering water to water user entities.
N.D.C.C. § 61-24.3-05