Within thirty (30) days of receipt of a bond release application, the director shall conduct an inspection and evaluation of the reclamation work involved. The evaluation must include the following:
(1) The degree of difficulty to complete a remaining reclamation.(2) Whether pollution of surface and subsurface water is occurring.(3) The probability of continuance or future occurrence of the pollution.(4) The estimated cost of abating the pollution.Pre-1995 Recodification Citation: 13-4.1-6-7(c).
As added by P.L. 1-1995, SEC.27.