If an application for total or partial bond release is filed with the director, the director shall notify appropriate:
in the county in which the surface coal mining operation is located by certified mail at least thirty (30) days before the release of all or a part of the bond.
IC 14-34-6-8
Pre-1995 Recodification Citation: 13-4.1-6-7(b).