(a) Drilling, blasting, or any type of longitudinal seismographic investigation will not be allowed within the highway rights-of-way under Department jurisdiction.
(b) The laying of temporary cable across interstate, primary, and secondary roads may be permitted upon receipt of a formal request by the respective District Maintenance Engineer.
(c) The District may issue Form M-23 "Seismograph Cable Crossing License" which outlines specific stipulations to be followed. (Also see Operating Policy 19-3).
045-6 Wyo. Code R. § 6-15