(a) Several Federal Regulations address the disturbing of wetlands and the mitigation of impacts caused by construction. It is possible that proposed utility construction within existing highway R/W could impact on existing or proposed wetland areas within the highway R/W.
(b) Construction through such wetland areas shall be avoided by the utility companies by planning alternate routing of their facilities.
(c) Relocation and/or adjustment of utility facilities in connection with proposed Highway Department construction of replacement wetland areas will be handled separately and in conjunction with the construction project and as outlined in FHPM7-7-7 "Mitigation of Environmental Impacts to Privately Owned Wetlands" or other rules/ regulations addressing this topic.
045-6 Wyo. Code R. § 6-14