Table 1A - Cross Referenceab
Status | Standardc | Compliance provisionsdsub. (4) |
A. Coating operation alone: New | Sub. (3) (b): Recover or destroy at least 93% of the VOC applied | (b) 1., (b) 2., (b) 3., (b) 4., (b) 5., (c), (d) |
Modified or reconstructed: | ||
1. If at least 90% of the VOC applied is recovered or destroyed prior to modification/reconstruction | Sub. (3) (c) 1. to 3.: a. Maintain demonstrated level of VOC control or 93%, whichever is lower. b. If the VOC control device is subsequently replaced the new control device shall be at least 95% efficient, a demonstration shall be made that the overall level of VOC control is at least as high as required with the old control device (90 to 93%) and, if the demonstration level is higher than the old level, maintain the higher level of control (up to 93%). | (a)1., (a) 3., (b) 1., (b)2., (b) 3., (b) 4., (c), (d) |
2. If existing coating operation has a total enclosure vented to a control device that is at least 92% efficient. | Sub. (3) (c) 4.: a. Continue to vent all VOC emissions to the control device and maintain control efficiency at or above the demonstrated level or 95%, whichever is lower. b. If the VOC control device is subsequently replaced, the new control device shall be at least 95% efficient and all VOC emissions shall be vented from the total enclosure to the new control device. | (a) 2., (b) 5., (c), (d) |
3. If existing coating operation is not in the previous 2 categories. | Sub. (3) (d): Recover or destroy at least 93% of the VOC applied | (b) 1., (b) 2., (b) 3., (b) 4., (b) 5., (c), (d) |
B. Coating mix preparation equipment alone: | ||
New: | ||
1. With concurrent construction of new VOC control device (other than a condenser) on the coating operation. | Sub. (3) (e): Install and use covers and vent to a control device that is at least 95% efficient.e | (b) 6. |
2. Without concurrent construction of new VOC control device on the coating operation or with concurrent construction of a condenser. | Sub.(3) (f) 1. or 2.: Install and use covers and vent to a control device or install and use covers.e | (b) 7., (b) 8. |
Modified or reconstructed | Sub. (3) (f) 1. or 2.: Install and use covers and vent to a control device or install and use covers.e | (h), (i) |
C. Both coating operation and coating mix preparation equipment: New and modified or reconstructed. | Sub. (3) (g): In lieu of standards in sub.(3) (a)-(f), use coatings containing a maximum of 0.20 kg VOC per liter of coating solids. | (b) 9. |
aThis table is presented for the convenience of the user and is not intended to supersede the language of the regulation. For the details of the requirements, refer to the text of the regulation.
bRefer to Part B to determine which paragraphs of subs. (5), (6) and (8) correspond to each compliance provision (sub. (4)).
cAs per sub. (1) (b), any new coating operation with solvent utilization <38 m3/yr or any modified or reconstructed coating operation with solvent utilization <370 m3/yr is exempt from the VOC standards (sub. (3)). Such coating operations are subject only to subs. (5) (a) and (8) (b) and (c). However, should a coating operation once exceed the applicable annual solvent utilization cutoff, that coating operation shall be subject to the VOC standards (sub. (3)) and all other applicable subsections. Once this has occurred, the coating operation shall remain subject to those requirements regardless of changes in annual solvent utilization.
dAs applicable
e40 CFR 60.716 permits the use of an alternative means of VOC emission limitation that achieves an equivalent or greater VOC emission reduction.
Table 1B - Cross Reference
Installation of | ||||
monitoring de- | Reporting and | |||
vices and | monitoring re- | |||
Compliance provisionsa | Test methods- | Category/ | recordkeeping | quirementsc |
sub. (4) | sub. (6) | equipmentb | sub. (5) | sub. (8) |
A. Coating operation alone: (b) 1. - When emissions from only the affected coating operation are controlled by a solvent recovery device, perform a liquid-liquid VOC material balance. | (a) | (b), (i), (k) | (a), (d) 1., (e), (h), (i) | |
(b) 2. - When emissions from only the affected coating operation are controlled by an incinerator or when a common emission control device (other than a carbon adsorption system with individual exhaust stacks for each adsorber vessel) is used to control emissions from an affected coating operation as well as from other sources of VOC, perform a gaseous emission test. | (b)-(g) | General | (i), (k) | (a), (e), (h), (i) |
CA | (c) | (d) 3., (d) 4. | ||
CO | (d) | (d) 5. | ||
TI | (e) | (d) 6. | ||
CI | (f) | (d) 7. | ||
PE,TE | (g) | (d) 8. | ||
(b) 3. - When emissions from both the affected coating operation and from other sources of VOC are controlled by a carbon absorption system with individual exhaust stacks for each adsorber vessel, perform a gaseous emission test. | (b)-(g) | General | (i), (k) | (a), (e), (h), (i) |
CA | (c) | (d) 3., (d) 4. | ||
PE, TE | (g) | (d) 8. | ||
(b) 4. - When emissions from more than one affected coating operation are vented through the same duct to a control device also controlling emissions from nonaffected sources that are vented separately from the affected coating operations, consider the combined affected coating operations as a single emission source and conduct a compliance test described in sub. (4) (b) 2. or 3. | (b)-(g) | General | (i), (k) | (a), (e), (h), (i) |
CA | (c) | (d) 3., (d) 4. | ||
CO | (d) | (d) 5. | ||
TI | (e) | (d) 6. | ||
CI | (f) | (d) 7. | ||
PE,TE | (g) | (d) 8. | ||
(b) 5. - Alternative to sub. (4) (b) 1. to 4.: Demonstrate that a total enclosure is installed around the coating operation and that all VOC emissions are vented to a control device with the specified efficiency. | (b)-(g) | General | (i), (k) | (a), (e), (h), (i) |
CA | (c) | (d) 3., (d) 4. | ||
CO | (d) | (d) 5. | ||
TI | (e) | (d) 6. | ||
CI | (f) | (d) 7. | ||
TE | (h) | (d) 8. | ||
B. Coating mix preparation equipment alone: | ||||
(b) 6. - Demonstrate that covers meeting the requirements of sub.(3) (e) 1. to 5. are installed and used properly; procedures detailing the proper use of covers are posted; the mix equipment is vented to a control device; and the control device efficiency is greater than or equal to 95%. | (b)-(g) | General CA TI CI | (k) (c) (e) (f) | (a), (e), (h), (i) (d) 3., (d) 4. (d) 6. (d) 7. |
(b) 7. - Demonstrate that covers meeting the requirements of sub.(3) (e) 1. to 5. are installed and used properly; procedures detailing the proper use of covers are posted; and the mix equipment is vented to a control device. | ||||
(b) 8. - Demonstrate that covers meeting the requirement of sub.(3) (e) 1. to 5. are installed and used properly and that procedures detailing the proper use of the covers are posted. | ||||
C. Both coating operation and coating mix preparation equipment: (b) 9. Determine that weighted average mass of VOC in the coating per volume of coating solids applied for each month. | (a) | (i), (j), (k) | (d) 2., (e), (g), (h), (i) |
aSub. (4) (a) specifies the procedures to be used prior to modification/reconstruction to establish the applicability of the VOC standards in sub. (3) (c) for modified/reconstructed coating operations. Subsection (4) (a) 1. requires the use of the procedures of sub. (4) (b) 1., 2., 3. or 4., to demonstrate prior to modification/reconstruction that 90% of the applied VOC is recovered or destroyed. Sub. (4) (a) 2. requires the use of procedures of sub. (4) (b) 5. to demonstrate prior to modification/reconstruction that the coating operation has a total enclosure vented to a control device that is at least 92% efficient. Sub. (4) (k) and (L) do not have corresponding test methods, monitoring, reporting or recordkeeping requirements.
bTI denotes thermal incinerator, CI denotes catalytic incinerator; CA denotes carbon adsorber; CO denotes condenser; PE denotes partial enclosure; TE denotes total enclosure.
cSee sub. (8) (f) for additional reporting requirements when coating mix preparation equipment is constructed at a time when no coating operation is being constructed. See sub. (8) (g) for addition reporting requirements when coating mix preparation equipment is constructed at the same time as an affected coating operation.
Note: See sub. (2) (a) 16.
Note: Under 40 CFR 60.716, if, in the administrator's judgment, an alternative means of emission limitation will achieve a reduction in emissions of VOC from any emission point subject to sub. (3) (e) or (f) (standards for mix equipment) at least equivalent to that required by sub. (3) (e) or (f), respectively, the administrator will publish in the Federal Register a notice permitting the use of the alternative means. The notice may condition permission on requirements related to the operation and maintenance of the alternative means. Any such notice shall be published only after public notice and an opportunity for a public hearing. Any person seeking permission under 40 CFR 60.716 shall submit either results from an emission test that documents the collection and measurement of all VOC emissions from a given control device or an engineering evaluation that documents the determination of such emissions.
Wis. Admin. Code Department of Natural Resources NR 440.71