Current through Register Vol. XLI, No. 50, December 13, 2024
Section 64-45-7 - Lead Abatement Designer Duties7.1. A licensed lead abatement designer shall generate a written report that provides; 7.1.a. A chronological time frame for each facet of the abatement activity;7.1.b. The name and address of the building or structure where the lead abatement project is to occur;7.1.c. The name, address, phone number, and lead abatement training certificates and licenses for the project designer;7.1.d. A schematic floor plan showing the lead abatement project area, including a description of the characteristics of the material;7.1.e. A statement identifying the abatement activity as repair, removal, encapsulation, or enclosure;7.1.f. A schematic floor plan of the project area which shows the physical dimensions, entrance, exit, windows, decontamination unit, load-out area, emergency exits, placement of the HEPA exhaust air filtration units, if applicable, and any measuring devices, warning signs, and barrier tape;7.1.g. The sampling protocol for project clearance for re-occupancy, including the number of samples, collection points and the analytical method to be employed;7.1.h. A schematic of the heating, ventilation and air-conditioning system shut-offs, electrical power, water source, fire exits, fire extinguisher, fire alarm, telephone, tool and equipment room, supply box, project field office, bathrooms and decontamination area;7.1.i. A description of the work procedures to be used;7.1.j. A description of the materials and tools to be used in the abatement project; and7.1.k. An occupant protection plan in accordance with subsection 16.1 and 16.4 of this rule.