Wash. Admin. Code § 296-150F-3000

Current through Register Vol. 24-23, December 1, 2024
Section 296-150F-3000 - [Effective until 1/1/2025] Factory-built housing and commercial structure fees

GENERAL INFORMATION

Manufacture:

Manufacturer #

1. Building use:

2. Building occupancy:

3. Type of construction:

4. Square footage of building:

5. Valuation of the building shall be based on the following:

*Square footage of the building multiplied by the amount in the BVD valuation table...................................................

6. Total valuation:.........................................................

$.....

$.....

PERMIT FEE

7. Calculate from building permit fee table using the total valuation..................

$ .....

STRUCTURAL PLAN REVIEW FEE*

8. One year design review: (Valid for one year) multiply the total on line 7 by 0.454 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9. Master plan review: (Valid for the code cycle) multiply the total on line 7 by 0.649 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

* Minimum plan review fee is 2 1/2 hours x $111.10 per hour

$ .....

$ .....

FIRE AND LIFE-SAFETY PLAN REVIEW FEE (if required)

10. Fire and life-safety plan review:

a. One year design-Multiply the total on line 7 by 0.194...................

b. Master plan design-Multiply the total on line 7 by 0.323................

*Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy

$ .....

$ .....

PLUMBING PLAN-REVIEW FEE

11. Plumbing $23.20 + $7.50 per fixture.........................

12. Medical gas $23.20 + $7.50 per gas outlet.....................

$ .....

$ .....

DESIGN RENEWAL OR ADDENDUM

13. 12.99% of building permit + $111.10......................

$ .....

RESUBMITTAL

14. 12.99% of building permit + $111.10......................

$ .....

ELECTRICAL PLAN-REVIEW FEE

15. See WAC 296-46B-906(9) for electrical review fees

NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA)

16. Notification to local enforcement agency fee:

$47.70

INSIGNIA FEES

17. FIRST SECTION

$ 355.60

18. EACH ADDITIONAL SECTION

$ 31.60

TOTAL FEES

19. Total plan review fees: Add lines 8 or 9 and 10 through 15 ...................

20. Total fees due: Includes plan fees, insignia fees, and NLEA fees .........

21. Total amount paid ......................................................

$ .....

$ .....

$ .....

Square Foot Construction Costs (BVD Table)a, b, c, and d

Group (2009 International Building Code)

IA

IB

IIA

IIB

IIIA

IIIB

IV

VA

VB

A-1 Assembly, theaters, with stage

211.15

203.98

198.73

190.05

178.25

173.30

183.31

162.97

156.05

A-1 Assembly, theaters, without stage

193.16

185.99

180.74

172.06

160.31

155.36

165.32

145.04

138.12

A-2 Assembly, nightclubs

163.22

158.56

154.17

148.00

138.96

135.24

142.52

126.06

121.36

A-2 Assembly, restaurants, bars, banquet halls

162.22

157.56

152.17

147.00

136.96

134.24

141.52

124.06

120.36

A-3 Assembly, churches

195.10

187.93

182.68

174.00

162.21

157.26

167.26

146.94

140.02

A-3 Assembly, general, community halls, libraries, museums

163.81

156.64

150.39

142.71

129.91

125.96

135.97

114.63

108.71

A-4 Assembly, arenas

192.16

184.99

178.74

171.06

158.31

154.36

164.32

143.04

137.12

B Business

164.76

158.78

153.49

145.97

132.45

127.63

139.92

116.43

110.93

E Educational

176.97

170.85

165.64

158.05

146.37

138.98

152.61

127.91

123.09

F-1 Factory and industrial, moderate hazard

97.87

93.28

87.66

84.46

75.44

72.26

80.79

62.17

58.48

F-2 Factory and industrial, low hazard

96.87

92.28

87.66

83.46

75.44

71.26

79.79

62.17

57.48

H-1 High hazard, explosives

91.74

87.15

82.53

78.33

70.49

66.31

74.66

57.22

N.P.

H-2, 3, 4 High hazard

91.74

87.15

82.53

78.33

70.49

66.31

74.66

57.22

52.53

H-5 HPM

164.76

158.78

153.49

145.97

132.45

127.63

139.92

116.43

110.93

I-1 Institutional, supervised environment

164.82

159.04

154.60

147.90

135.84

132.25

144.15

121.88

117.55

I-2 Institutional, hospitals

277.07

271.09

265.80

258.28

243.90

N.P.

252.23

227.88

N.P.

I-2 Institutional, nursing homes

193.00

187.02

181.74

174.22

160.98

N.P.

168.16

144.96

N.P.

I-3 Institutional, restrained

187.72

181.73

176.45

168.93

156.64

150.82

162.87

140.63

133.13

I-4 Institutional, day care facilities

164.82

159.04

154.60

147.90

135.84

132.25

144.15

121.88

117.55

M Mercantile

121.57

116.92

111.53

106.36

96.96

94.25

100.88

84.07

80.36

R-1 Residential, hotels

166.21

160.43

155.99

149.29

137.39

133.80

145.70

123.43

119.10

R-2 Residential, multiple family

139.39

133.61

129.17

122.47

111.23

107.64

119.54

97.27

92.94

R-3 Residential, one and two family

131.18

127.60

124.36

121.27

116.43

113.53

117.42

108.79

101.90

R-4 Residential, care/assisted living facilities

164.82

159.04

154.60

147.90

135.84

132.25

144.15

121.88

117.55

S-1 Storage, moderate hazard

90.74

86.15

80.53

77.33

68.49

65.31

73.66

55.22

51.53

S-2 Storage, low hazard

89.74

85.15

80.53

76.33

68.49

64.31

72.66

55.22

50.53

U Utility, miscellaneous

71.03

67.02

62.71

59.30

52.86

49.43

56.33

41.00

39.06

a Private garages use utility, miscellaneous

b Unfinished basements (all use group) = $15.00 per sq. ft.

c For shell only buildings deduct 20 percent

d N.P. = not permitted

Table 1-A - Building Permit Fees

Total Valuation

Fee

$1.00 to $500.00

$23.50

$501.00 to $2,000.00

$23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00

$2,001.00 to $25,000.00

$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00

$25,001.00 to $50,000.00

$391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00

$50,001.00 to $100,000.00

$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00

$100,001.00 to $500,000.00

$993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00

$500,001.00 to $1,000,000.00

$3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00

$1,000,001.00 and up

$5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof

INITIAL FILING FEE (first time applicants)

$86.70

DESIGN PLAN FEES:

INITIAL FEE - MASTER DESIGN (code cycle), 50% of permit fee × 1.299*

INITIAL FEE - ONE YEAR DESIGN, 35% of permit fee × 1.299*

RENEWAL FEE - 10% of permit fee × 1.299 +

$111.10

RESUBMIT FEE - 10% of permit fee × 1.299 +

$111.10

ADDENDUM (approval expires on same date as original plan) - 10% of permit fee × 1.299 +

$111.10

PLUMBING PLAN FEE, $23.20 + PER FIXTURE FEE of

$7.50

MEDICAL GAS PLAN FEE, $23.20 + PER OUTLET FEE of

$7.50

Note: Mechanical systems are included in the primary plan fee

FIRE SAFETY PLAN REVIEW AS REQUIRED (Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy)

MASTER DESIGN - 25% of permit fee × 1.299

One year design - 15% of the permit fee × 1.299

ELECTRICAL PLAN REVIEW - Find fees @ http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906

RECIPROCAL PLAN REVIEW:

INITIAL FEE-MASTER DESIGN (minimum 3 hours)

$111.10 per hour

INITIAL FEE-ONE YEAR DESIGN (minimum 2 hours)

$111.10 per hour

RENEWAL FEE (minimum 1 hour)

$111.10

ADDENDUM (minimum 1 hour)

$111.10 per hour

PLANS APPROVED BY LICENSED PROFESSIONALS - 10% of permit fee × 1.299 +

$111.10

FEES FOR RESUBMITTAL OF DESIGN PLANS APPROVED BY A PROFESSIONAL OR FIRM

$111.10 per hour

APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST THREE SETS - 5% of permit fee × 1.299 +

$111.10

DEPARTMENT INSPECTION FEES

INSPECTION/REINSPECTION (Per hour** plus travel time** and mileage***)

$111.10

TRAVEL (Per hour**)

$111.10

PER DIEM***

HOTEL****

MILEAGE***

RENTAL CAR****

PARKING****

AIRFARE****

DEPARTMENT AUDIT FEES:

AUDIT (Per hour**)

$111.10

TRAVEL (Per hour**)

$111.10

PER DIEM***

HOTEL****

MILEAGE***

RENTAL CAR****

PARKING****

AIRFARE****

INSIGNIA FEES:

FIRST SECTION

$355.60

EACH ADDITIONAL SECTION

$31.60

REISSUED-LOST/DAMAGED

$86.70

OTHER FEES:

FIELD TECHNICAL SERVICE (Per hour** plus travel time** and mileage***)

$111.10

NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA)

$47.70

PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)

$17.60

REFUND FEE

$32.30

*Minimum plan review fee is 2 1/2 hours at the field technical service rate.

**Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.

***Per state guidelines.

****Actual charges incurred.

Wash. Admin. Code § 296-150F-3000

Amended by WSR 18-24-102, Filed 12/4/2018, effective 1/4/2019
Amended by WSR 20-04-081, Filed 2/4/2020, effective 3/6/2020
Amended by WSR 21-07-126, Filed 3/23/2021, effective 4/23/2021
Amended by WSR 22-19-074, Filed 9/20/2022, effective 11/1/2022
Amended by WSR 23-09-024, Filed 4/11/2023, effective 4/11/2023
Amended by WSR 23-21-084, Filed 10/17/2023, effective 12/1/2023

Statutory Authority: Chapter 43.22 RCW and 2011 1st sp.s. c 50. 12-06-069, § 296-150F-3000, filed 3/6/12, effective 4/30/12. Statutory Authority: Chapters 18.106, 43.22 RCW, 2008 c 285 and c 329. 08-12-042, § 296-150F-3000, filed 5/30/08, effective 6/30/08. Statutory Authority: Chapters 18.27, 18.106, 43.22, and 70.87 RCW. 07-11-128, § 296-150F-3000, filed 5/22/07, effective 6/30/07. Statutory Authority: Chapter 43.22 RCW. 07-05-063, § 296-150F-3000, filed 2/20/07, effective 4/1/07. Statutory Authority: Chapters 18.106, 43.22, and 70.87 RCW. 06-10-066, § 296-150F-3000, filed 5/2/06, effective 6/30/06. Statutory Authority: Chapter 43.22 RCW. 05-23-002, § 296-150F-3000, filed 11/3/05, effective 12/4/05. Statutory Authority: Chapters 18.27, 43.22, and 70.87 RCW. 05-12-032, § 296-150F-3000, filed 5/24/05, effective 6/30/05. Statutory Authority: Chapter 43.22 RCW and 2003 c 291. 05-01-102, § 296-150F-3000, filed 12/14/04, effective 2/1/05. Statutory Authority: Chapters 18.27 and 43.22 RCW. 04-12-048, § 296-150F-3000, filed 5/28/04, effective 6/30/04. Statutory Authority: RCW 43.22.340, 43.22.400, 43.22.432, 43.22.433, 43.22.434, 43.22.480, and 43.22.485, 2002 c 268, and chapter 43.22 RCW. 03-12-044, § 296-150F-3000, filed 5/30/03, effective 5/30/03. Statutory Authority: RCW 43.22.350, 43.22.434, 43.22.480, 43.22.500, 18.27.070, 18.27.075, 70.87.030, 19.28.041, 19.28.051, 19.28.101, 19.28.121, 19.28.161, 19.28.201, 19.28.211, 19.28.341, 2001 c 159, and chapters 43.22, 19.28, 18.27, and 70.87 RCW. 01-12-035, § 296-150F-3000, filed 5/29/01, effective 6/29/01. Statutory Authority: Chapters 43.22, 18.27, 70.87 and 19.28 RCW. 99-12-080, § 296-150F-3000, filed 5/28/99, effective 6/28/99. Statutory Authority: Chapters 18.106, 18.27 and 43.22 RCW. 98-12-041, § 296-150F-3000, filed 5/29/98, effective 6/30/98. Statutory Authority: RCW 70.87.030, 18.27.070, [18.27.]075,43.22.350 , [43.22.]355, [43.22.]434 and [43.22.]480(2). 97-11-053, § 296-150F-3000, filed 5/20/97, effective 6/30/97. Statutory Authority: RCW 43.22.340, [43.22.]355, [43.22.]360,[43.22.]432 , [43.22.]440 and [43.22.]480. 96-21-146, § 296-150F-3000, filed 10/23/96, effective 11/25/96.