TABLE 4.1. BASE FEE RATES FOR ANNUAL WASTE MANAGEMENT FACILITY FEES. | |
Category of Facility/Activity | Base Fee Rate |
1. Sanitary landfills, noncaptive industrial landfills, and construction and demolition landfills are assigned a base fee rate as follows: | |
Sanitary landfill | $0.115 per ton of waste landfilled |
Construction, demolition, debris landfill | $0.115 per ton of waste landfilled |
Noncaptive industrial landfill | $0.115 per ton of waste landfilled |
2. Incinerators and energy recovery facilities are assigned a base fee rate based upon their annual tonnage as follows: | |
Base Fee Rate | |
Incinerators | $0.055 per ton of waste incinerated |
Energy recovery facilities | $0.055 per ton of waste incinerated |
3. Other types of facilities are assigned a base fee rate as follows: | |
Type of Facility/Activity | Base Fee Rate |
Composting | $1,200 |
Regulated medical waste | $2,500 |
Materials recovery | $4,500 |
Transfer station | $5,500 |
Facilities in post-closure care | $1,000 |
4. Active captive industrial landfills are assigned a base fee rate as follows: | |
Type of Facility/Activity | Base Fee Rate |
Small landfills (landfilling less than 100,000 tons per year) | $2,500 |
Large landfills (landfilling 100,000 tons or more per year) | $7,500 |
9 Va. Admin. Code § 20-90-130
Statutory Authority
§ 10.1-1402 of the Code of Virginia.