TABLE 3.1-1. NEW OR INITIAL ISSUANCE OR ACTION. | |||
TYPE OF FACILITY | FEE | ||
All landfills: | |||
Part A application | $4,180 | ||
Part B application | $18,680 | ||
Incineration/Energy Recovery Facility | $5,880 | ||
Transfer Station, Materials Recovery Facility, Regulated Medical Waste Storage or Transfer Facility, or Regulated Medical Waste Treatment Facility | $4,310 | ||
Compost Facility | |||
Facilities Processing Category I Waste | $6,850 | ||
Facilities Processing Waste Categories I, II, or III, or Categories III and Lower | $10,550 | ||
Facilities Processing Waste Categories I, II, III, or IV, or Categories IV and Lower | $12,670 | ||
Experimental Solid Waste Facility | $2,090 | ||
Permit-by-rule Initial Review and Confirmation | $390 | ||
Emergency Permit | $2,310 |
TABLE 3.1-2. MAJOR PERMIT ACTIONS, AMENDMENTS, OR MODIFICATIONS. | ||
TYPE OF PERMIT MODULE | FEE | |
Landfill Part A | $4,180 | |
General - Module I | $390 | |
Facility - Module II | $1,310 | |
Landfill - Module III, IV, or V | $7,050 | |
Design plan review | $910 | |
Liner design review | $1,960 | |
Leachate system review | $1,310 | |
Gas management plan review | $1,700 | |
Drainage plan review | $910 | |
Cover design review | $1,830 | |
Equipment | $390 | |
Compost facility - Module VI | $3,660 | |
Design plan review | $650 | |
Liner design review | $1,310 | |
Leachate system review | $910 | |
Drainage plan review | $650 | |
Equipment | $390 | |
Transfer station - Module VII | $1,180 | |
Material recovery facility - Module VIII | $1,570 | |
Waste supply analysis | $650 | |
Waste management areas | $520 | |
Wastewater management areas | $390 | |
Incinerator/Energy recovery facility - Module IX | $3,000 | |
Waste and residue storage | $910 | |
Operational requirements | $1,570 | |
Waste control procedures | $520 | |
Groundwater monitoring - Module X or XI | $3,260 | |
Well placement | $1,310 | |
Materials and specifications | $390 | |
Sampling plan | $1,570 | |
Closure - Module XII | $390 | |
Post-closure - Module XIII | $390 | |
Corrective action - Module XIV | $3,000 | |
Leachate handling Module XV | $1,310 | |
Regulated medical waste storage or transfer facility - Module XVI | $390 | |
Regulated medical waste treatment facility - Module XVII | $390 | |
Permit-by-rule Modification Review and Confirmation | $390 | |
Public participation (does not include costs of newspaper advertisements or radio broadcasts) | $1,040 |
TABLE 3.1-3. VARIANCE REQUESTS. | ||
TYPE OF VARIANCE | FEE | |
Base fee for all variances | $390 | |
Supplemental fees based on variance type | ||
Exemption from classification as a solid waste | $520 | |
Variance to permitting requirements | ||
Siting requirements | $520 | |
Facility design (other than alternate liner design) | $520 | |
Operational requirements | -- | |
Groundwater monitoring (other than groundwater protection standards and location of monitoring system) | $920 | |
Closure requirements | -- | |
Post-closure requirements | -- | |
Groundwater Protection Standards | -- | |
Alternate liner system design | $1,570 | |
Location of groundwater monitoring system | $920 |
9 Va. Admin. Code § 20-90-120
Statutory Authority: § 10.1-1402 of the Code of Virginia