Current through Register Vol. 41, No. 4, October 8, 2024
Section 9VAC15-100-80 - Small energy storage facility design standards and operational plansA. The design and installation of the small energy storage facility shall incorporate any requirements of the mitigation plan that pertain to design and installation if a mitigation plan is required pursuant to 9VAC15-100-50 or 9VAC15-100-60 as applicable.B. The applicant shall prepare an operation plan detailing operational parameters for the project, including (i) remote monitoring or staffing requirements, (ii) emergency procedures and contacts, (iii) vegetation to be used within the disturbance zone and 100-foot buffer or local zoning setback requirement as applicable, and (iv) application frequency of pesticides or herbicides over the life of the project. Owners and operators are encouraged to utilize the link to the DACS Fieldwatch in 9VAC15-100-120 B 6 prior to the application of either pesticides or herbicides.9 Va. Admin. Code § 15-100-80
Derived from Virginia Register Volume 38, Issue 11, eff. 1/1/2022.Statutory Authority: §§ 10.1-1197.5 and 10.1-1197.6 of the Code of Virginia.