Section R661-7-501 - Required Documentation for Housing Projects
(1) A Navajo Nation Homesite Lease will be required of all new house construction and construction completion projects.
(2) For other types of Housing Assistance applicants are strongly encouraged to have a homesite lease available for proof of ownership, utilities and other services.
(3) Matching fund agencies shall be identified and commitment letters from each agency shall be included in the proposal package.
(4) Applicants must provide documentation naming a successor owner/lessee who is permitted to occupy the residence and is obligated to maintain the property.
(5) All new construction must be based on a floor plan showing all components of the dwelling unit to be constructed. Additionally, a specific list of all materials to be used and an estimate of total man-hours for construction is required.
(6) Proof of the applicants contribution towards the construction, addition, or renovation of a dwelling in the form of receipts for the purchase of cement as well as proof of purchase of adequate waterproof material for protection from moisture damage to the bags of cement purchased.