Current through Bulletin No. 2024-21, November 1, 2024
Section R23-1-710 - Correction or Withdrawal of Proposal, Subcontractor List, and Bond errors(1) In the event an offeror submits a proposal that on its face appears to be impractical, unrealistic, or otherwise in error, the director may contact the offeror to either confirm the proposal, permit a correction of the proposal, or permit the withdrawal of the proposal, in accordance with Section 63G-6a-704.6.(2) Offerors may not correct errors, deficiencies, or incomplete responses in a proposal that has been determined to be not responsible, not responsive, or that does not meet the mandatory requirements stated in the request for proposals in accordance with Section 63G-6a-703.(3) If there is any deficiency or failure to submit a required subcontractor list or bid bond, the division may request that the offeror who is not in compliance submit the required subcontractor list or bid bond by 5 p.m. of the next business day after notice is provided by the division. Failure to cure the deficiency or failure to submit any required subcontractor list or bid bond by 5 p.m. of the next business day after notice is provided by the division shall make the offeror ineligible for consideration of award of the contract.Utah Admin. Code R23-1-710
Adopted by Utah State Bulletin Number 2015-7, effective 3/3/2015Amended by Utah State Bulletin Number 2022-06, effective 2/24/2022Amended by Utah State Bulletin Number 2023-04, effective 2/8/2023