The secretary shall set a maximum injection pressure for each well which assures that the pressure in the injection zone during injection does not initiate new fractures in the confining zone, propagate existing fractures in the confining zone, or cause the movement of fluids into a freshwater resource. The injection pressure at the wellhead may not exceed the maximum permitted pressure, which must be calculated by methods approved by the secretary. If requested by the operator, the secretary may allow an increase in the maximum injection pressure utilizing the notice of recommendation procedure in chapter 74:12:09.
S.D. Admin. R. 74:12:07:21
General Authority: SDCL 45-9-11, 45-9-13.
Law Implemented: SDCL 45-9-11, 45-9-13, 45-9-14.