Wells used for the injection of any substance must be constructed with adequate casing, tubing, and packer. There shall be no leak in the casing, tubing, or packer that results in the well failing a mechanical integrity test. The wells must be cased and cemented to prevent fluid movement into freshwater resources. Operators shall repair or plug wells with defective casings, in compliance with §§ 74:12:02:13, 74:12:03:01, and 74:12:03:02.
S.D. Admin. R. 74:12:07:10
General Authority: SDCL 45-9-13.
Law Implemented: SDCL 45-9-11, 45-9-13.