S.D. Admin. R. 74:02:04:41

Current through Register Vol. 51, page 67, December 16, 2024
Section 74:02:04:41 - Drill hole construction requirements

Drill holes must be straight and plumb and must be of sufficient size to allow installation of the casing, centralizers, grout, gravel pack, screen, and pump. The drilling methods must fit the geologic characteristics and conditions at the well site.

S.D. Admin. R. 74:02:04:41

SL 1975, ch 16, § 1; transferred from § 52:01:04:03, effective 7/1/1979; transferred from § 74:02:04:03, 12 SDR 50, effective 9/29/1985; 13 SDR 129, 13 SDR 141, effective 7/1/1987; 18 SDR 224, effective 7/16/1992.

General Authority: SDCL 46-2-5, 46-6-20.

Law Implemented: SDCL 46-6-6.1, 46-6-10, 46-6-20.