All plastic piping used for closed-loop installation must meet or exceed ASTM D 2666-89 or ASTM Standard D 3035-91 and must be joined by thermal fusion.
S.D. Admin. R. 74:02:04:40
General Authority: SDCL 46-2-5, 46-6-20, 46-6-27.
Law Implemented: SDCL 46-6-6.1, 46-6-10, 46-6-20, 46-6-27.
ASTM D 2666-89, "Standard Specification for Polybutylene (PB) Plastic Tubing," February 24, 1989, and ASTM Standard D 3035-91, "Standard Specification for Polybutylene (PE) Plastic Pipe (SDR-PR) Based on Controlled Outside Diameter," February 24, 1989, published by the American Society for Testing and Materials, D 2666-89, May 1989, and D 3035-91, August 1991. Copies may be obtained from the American Society for Testing and Materials, 1916 Race Street, Philadelphia, PA 19103. Cost: $12 each.