If a mining permit, discharge permit, or any other permit is required in addition to a water permit, pertinent information including conceptual design parameters relevant to the water permit and required for the other permits, must be available for the water permit application hearing if required by the board or chief engineer.
S.D. Admin. R. 74:02:01:12.01
General Authority: SDCL 46-2-5.
Law Implemented: SDCL 46-2-11, 46-5-11.