If diversion is to be from a well, a log of the well or test hole shall be completed by a licensed well driller pursuant to § 74:02:04:65 and submitted with the application. If it is not practical to drill test holes for a well or if existing geologic information is available as determined by the chief engineer, an estimate of the depth of the well must accompany the application. An "as built" driller's report of well construction shall be sent to the chief engineer within 30 days after completion of the well.
S.D. Admin. R. 74:02:01:08.01
General Authority: SDCL 46-2-5.
Law Implemented: SDCL 46-6-11.