S.D. Admin. R. 70:03:01:45.06

Current through Register Vol. 51, page 67, December 16, 2024
Section 70:03:01:45.06 - Multiple-trip permit - Construction equipment - Fees

At the time of application for a multiple-trip construction equipment permit, the permit user shall designate the counties and period of time to be permitted. The fee for a multiple-trip permit is determined by the number of counties and months designated by the permit user and is based on a charge of $5 a month for each designated county but not more than a total of $20 a month for all of the designated counties, excluding additional overweight fees. The minimum fee for a multiple-trip permit issued under §§ 70:03:01:45.01 to 70:03:01:45.05, inclusive, is $25, excluding additional overweight fees.

Overweight units shall be charged an additional fee based on a charge of 50 cents a month for each designated county for each ton or fraction of a ton that the unit's gross weight is over the weight limits set in § 70:03:01:02.

S.D. Admin. R. 70:03:01:45.06

16 SDR 137, effective 2/28/1990; 21 SDR 188, effective 5/7/1995; 31 SDR 26, effective 9/6/2004.

General Authority: SDCL 32-22-42.

Law Implemented: SDCL 32-22-38, 32-22-41, 32-22-42.