Early in the external inspection the water and steam passageways must be blown down separately to ensure that both connections are clear. The inspector shall observe the blowdown of the water glass to verify the immediate return of water to the glass. The procedure to use in blowing down the glass is as follows:
If this procedure does not show that both connections are clear, the boiler must be shut down.
S.D. Admin. R. 61:08:09:35
General Authority: SDCL 34-29A-14.1.
Law Implemented: SDCL 34-29A-14.1.