Chapter 61:08:09 - Historic power boilers
- Section 61:08:09:01 - Definitions
- Section 61:08:09:02 - Schedule of inspections
- Section 61:08:09:03 - Inspection fees
- Section 61:08:09:04 - Appeal from decision by inspector
- Section 61:08:09:05 - Internal inspection of boilers
- Section 61:08:09:06 - Preparation of boiler for internal inspection
- Section 61:08:09:07 - Internal inspection - Openings
- Section 61:08:09:08 - Internal inspection - Evidence of overheating
- Section 61:08:09:09 - Internal inspection - Condition of flues
- Section 61:08:09:10 - Internal inspection - Checking for cracks
- Section 61:08:09:11 - Internal inspection - Extent of corrosion
- Section 61:08:09:12 - Internal inspection - Test of staybolts
- Section 61:08:09:13 - Maximum allowable working pressure
- Section 61:08:09:14 - Requirements for hydrostatic pretest
- Section 61:08:09:15 - Hydrostatic pretest - Pipe requirements
- Section 61:08:09:16 - Hydrostatic pretest - Steam gauge connections
- Section 61:08:09:17 - Hydrostatic pretest - Steam gauge capacity
- Section 61:08:09:18 - Hydrostatic pretest - Safety valve requirements
- Section 61:08:09:19 - Hydrostatic pretest - Steam outlet requirements
- Section 61:08:09:20 - Hydrostatic pretest - Blowoff valve requirements
- Section 61:08:09:21 - Hydrostatic pretest - Feed water pipe requirements
- Section 61:08:09:22 - Hydrostatic pretest - Feed water supply
- Section 61:08:09:23 - Hydrostatic pretest - Water level indicator
- Section 61:08:09:24 - Requirements to perform hydrostatic test
- Section 61:08:09:25 - Required hydrostatic test pressure
- Section 61:08:09:26 - Hydrostatic test - Required water temperature
- Section 61:08:09:27 - Hydrostatic test - Safety valve and steam gauge requirements
- Section 61:08:09:28 - Duration of hydrostatic test
- Section 61:08:09:29 - Ultrasonic examination for thickness determination
- Section 61:08:09:30 - Internal inspection report
- Section 61:08:09:31 - External inspections and tests
- Section 61:08:09:32 - Preparation of boiler for external inspection
- Section 61:08:09:33 - External inspection - Cleanliness and ASME compliance
- Section 61:08:09:34 - External inspection - Evidence of leakage
- Section 61:08:09:35 - External inspection - Water glass requirements
- Section 61:08:09:36 - External inspection - Safety valve requirements
- Section 61:08:09:37 - External inspection - Blowoff piping requirements
- Section 61:08:09:38 - External inspection report
- Section 61:08:09:39 - Repairs to historic power boilers
- Section 61:08:09:40 - Minor repairs
- Section 61:08:09:41 - Major repairs
- Section 61:08:09:42 - Tests following major repairs
- Section 61:08:09:43 - Repair methods
- Section 61:08:09:44 - Repair of defects
- Section 61:08:09:45 - Repair of cracks
- Section 61:08:09:46 - Repair of minor cracks and imperfections
- Section 61:08:09:47 - Repair of cracks radiating from holes
- Section 61:08:09:48 - Repair of welded butt joints
- Section 61:08:09:49 - Repair of wasted surfaces
- Section 61:08:09:50 - Welding on butt straps
- Section 61:08:09:51 - Staybolt replacement
- Section 61:08:09:52 - Inspection of welds
- Section 61:08:09:53 - Approval of major repairs and report
- Section 61:08:09:54 - Requirements for construction of new boilers
- Section 61:08:09:55 - Qualifications of inspectors
- Appendix A - Guide to Riveted Joint Efficiencies