Section 61:08:09:32 - Preparation of boiler for external inspection

The owner or user of the boiler shall prepare for an external inspection by:

(1) Installing all handhold plates, washout plugs, and inspection plugs;
(2) Filling the boiler with water to the desired level in preparation for firing the boiler;
(3) Installing the safety valves, steam gauge, and other essential equipment needed to build up and maintain normal operating pressure; and
(4) Removing all lagging and insulation.

S.D. Admin. R. 61:08:09:32

23 SDR 139, effective 3/5/1997.

General Authority: SDCL 34-29A-14.1.

Law Implemented: SDCL 34-29A-14.1.