S.D. Admin. R. 61:08:09:24

Current through Register Vol. 51, page 67, December 16, 2024
Section 61:08:09:24 - Requirements to perform hydrostatic test

If the inspector determines that the boiler has satisfactorily met the conditions outlined in §§ 61:08:09:15 to 61:08:09:23, inclusive, the inspector may proceed with the hydrostatic test as set forth in §§ 61:08:09:25 to 61:08:09:28, inclusive.

S.D. Admin. R. 61:08:09:24

23 SDR 139, effective 3/5/1997.

General Authority: SDCL 34-29A-14.1.

Law Implemented: SDCL 34-29A-14.1.