S.D. Admin. R. 61:08:09:17

Current through Register Vol. 51, page 67, December 16, 2024
Section 61:08:09:17 - Hydrostatic pretest - Steam gauge capacity

The capacity of the pressure gauge must be approximately double the pressure at which the safety valve is set. It may not be less than 11/2 times the MAWP.

S.D. Admin. R. 61:08:09:17

23 SDR 139, effective 3/5/1997.

General Authority: SDCL 34-29A-14.1.

Law Implemented: SDCL 34-29A-14.1.

(MAWP) Maximum allowable working pressure, § 61:08:09:13.