Since cogeneration systems parallel power supplier systems, all cogeneration equipment must satisfy requirements of existing systems with which it is to be interconnected. In cases of conflicting requirements of both the power supplier and the commission, the more stringent requirements shall apply.
S.D. Admin. R. 20:44:25:05
General Authority: SDCL 36-16-12.
Law Implemented: SDCL 36-16-27.