S.D. Admin. R. 20:44:18:02

Current through Register Vol. 51, page 67, December 16, 2024
Section 20:44:18:02 - Obtaining a wiring permit

Wiring permits may be obtained for $15 each from the commission office.

An owner doing wiring in compliance with SDCL 36-16-15 may obtain wiring permits from the commission office or from state electrical inspectors for $15 each.

Wiring permits are valid for three years from the date the permit is issued. Electrical installations that extend beyond three years from that date must have new wiring permits posted and sent to the commission office before the expiration of the three-year limit. Failure to date the wiring permit at the start of the job constitutes a late wiring permit procedure and subjects the installer to a $100 administrative fee. Failure to renew the permit on electrical installations that are not completed constitutes a late wiring permit procedure which subjects the installer to a $100 administrative fee.

S.D. Admin. R. 20:44:18:02

SL 1975, ch 16; 46 SDR 128, effective 5/26/2020

General Authority: SDCL 36-16-12, 36-16-27, 36-16-30.

Law Implemented: SDCL 36-16-28, 36-16-30.