The following require a wiring permit:
(1) Any electrical service entrance. A single wiring permit may be used for a temporary electrical service and a new service on a single project when both are installed by the same contractor, which must be stated on the wiring permit at the start of the project. Separate wiring permits are required if more than one contractor is involved; and(2) Electrical wiring being performed under an owner's exemption.Any other electrical installation with a calculated inspection fee of ten dollars or greater requires a wiring permit and minimum electrical inspection fee of no less than one hundred dollars or a specific fee as provided by chapter 20:44:20, unless a wiring permit is not required under the provisions of article 20:44 and SDCL chapter 36-16.
S.D. Admin. R. 20:44:18:01
SL 1975, ch 16, § 1; 12 SDR 151, 12 SDR 155, effective 7/1/1986; 13 SDR 75, 13 SDR 95, effective 1/1/1987; 20 SDR 92, January 1, 1994; 20 SDR 222, effective 7/6/1994; transferred from § 20:44:04:01, August 12, 1994; 32 SDR 37, effective 9/1/2005; 37 SDR 236, effective 6/29/2011; 51 SDR 054, effective 11/12/2024General Authority: SDCL 36-16-12.
Law Implemented: SDCL 36-16-27, 36-16-29, 36-16-30.