If a planned excavation ticket is issued to mark the site of a planned excavation within the next eighteen months, the underground facility operator shall respond within five working days from the notification time or by the start time on the ticket, whichever is later, excluding Saturdays, Sundays, and legal holidays of the state, following the issuance of the planned excavation locate request. Since no excavation will occur, the operator of the underground facility, after consultation with the planner, shall determine from the following alternative methods, the appropriate means for providing the underground facility location information. Should the planner be unsatisfied with the means selected, they may require that the underground facilities be marked. The facility operator may require compensation to recover the direct labor costs associated with the marking of the excavation site pursuant to § 20:25:03:04.05:
If a ticket is issued to mark the site of an informational locate request, the underground facility operator shall respond within five working days from the notification time or by the start time on the ticket, whichever is later, excluding Saturdays, Sundays, and legal holidays of the state, following the issuance of the locate request. The operator shall respond in the manner provided for planned excavation locate requests.
S.D. Admin. R. 20:25:03:10.01
General Authority: SDCL 49-7A-4.
Law Implemented: SDCL 49-7A-2, 49-7A-5, 49-7A-6, 49-7A-8.