S.D. Admin. R. 20:10:39:36

Current through Register Vol. 51, page 67, December 16, 2024
Section 20:10:39:36 - Measurement requirements for the 48 hour test

When conducting the 48 hour test, measurements to the earth or concrete surface must be to a metal plate as described in § 20:10:32:31. When making measurements to metal objects, corrosion is removed to obtain a low resistance connection.

S.D. Admin. R. 20:10:39:36

42 SDR 174, effective 6/21/2016

General Authority: SDCL 49-47-2.

Law Implemented: SDCL 49-47-2, 49-47-3.