The public utility shall keep records relating to all applications and small generator facilities for a period of three years. The public utility shall provide the records for commission inspection upon request. The public utility shall annually provide to the commission a list of each small generator facility that is interconnected to the public utility's EDS during the calendar year and shall include the size of the facility, the amount paid by the small generator to the public utility for interconnection, the date of the application, and the date the interconnection was completed. The report for the calendar year is due the following March 1.
S.D. Admin. R. 20:10:36:63
General Authority: SDCL 49-34A-27, 49-34A-93.
Law Implemented: SDCL 49-34A-27, 49-34A-93.