S.D. Admin. R. 20:10:36:61

Current through Register Vol. 51, page 67, December 16, 2024
Section 20:10:36:61 - Tier 4 interconnection completion

The tier 4 interconnection is considered complete when:

(1) All interconnection facilities and system upgrades are completed and operational;
(2) The small generator facility installation is inspected and approved by the electric code inspector with jurisdiction over the interconnection;
(3) There is a successful completion of the witness test, if conducted by a public utility;
(4) The parties execute a certificate of completion; and
(5) The parties execute an interconnection agreement.

S.D. Admin. R. 20:10:36:61

35 SDR 305, effective 7/1/2009.

General Authority: SDCL 49-34A-27, 49-34A-93.

Law Implemented: SDCL 49-34A-27, 49-34A-93.