Section 20:10:36:61 - Tier 4 interconnection completionThe tier 4 interconnection is considered complete when:
(1) All interconnection facilities and system upgrades are completed and operational;(2) The small generator facility installation is inspected and approved by the electric code inspector with jurisdiction over the interconnection;(3) There is a successful completion of the witness test, if conducted by a public utility;(4) The parties execute a certificate of completion; and(5) The parties execute an interconnection agreement.S.D. Admin. R. 20:10:36:61
35 SDR 305, effective 7/1/2009.General Authority: SDCL 49-34A-27, 49-34A-93.
Law Implemented: SDCL 49-34A-27, 49-34A-93.