The plan shall be electronically filed with the commission. A copy of each plan shall also be filed by the utility with the county auditor of each county designated by the commission within 15 days after the commission has made the designation.
S.D. Admin. R. 20:10:21:22
General Authority: SDCL 49-41B-35.
Law Implemented: SDCL 49-41B-3, 49-41B-35.