Section 20:10:21:04 - Existing energy conversion facilitiesFor existing energy conversion facilities, that are owned or operated by the utility to serve South Dakota load, the utility shall provide information as follows:
(2) Type and nameplate capacity;(3) Net capacity and annual production in megawatt hours for each of the past two calendar years; (4) Water source and actual annual use and consumption in acre feet for each of the past two calendar years;(5) Fuel type and source and annual consumption of fuel for each of the past two calendar years; and(6) Projected date of removal from service and the reason for removal.(7) Decommissioning plans for any facility expected to be retired in the next ten years.S.D. Admin. R. 20:10:21:04
4 SDR 7, effective 11/13/1977; 12 SDR 151, 12 SDR 155, effective 7/1/1986; 47 SDR 125, effective 5/30/2021General Authority: SDCL 49-41B-35.
Law Implemented: SDCL 49-41B-3(1), 49-41B-3(4).