Or. Admin. Code § 632-010-0182

Current through Register Vol. 63, No. 12, December 1, 2024
Section 632-010-0182 - Gas to Be Metered
(1) Meters: All gas sold must be metered with a meter of sufficient capacity, provided that gas may be metered from a lease or unitized property as a whole, if it is shown that a ratable taking can be maintained. Meters are not required for gas produced and used on the lease for development purposes and lease operations.
(2) Meter Charts and Records: Purchasers must keep meter charts and gas purchase records for a period of at least two years and make the charts and records available to the department.
(3) Bypasses: Bypasses are not to be connected around meters or points where custody of the fluid is transferred.

Or. Admin. Code § 632-010-0182

GMI 1, f. 1-27-54; GMI 1-1982, f. & ef. 6-25-82; GMI 4-1985, f. & ef. 11-20-85; GMI 6-1990, f. & cert. ef. 12-5-90; GMI 2-1995, f. & cert. ef. 3-10-95; DGMI 1-2013, f. & cert. ef. 3-21-13

Stat. Auth.: ORS 520

Stats. Implemented: ORS 520.095