The permittee must test for open-flow and pressure of completed gas wells at such intervals and continue for such time as is necessary to effect accurate determination. The permittee must file a report of all tests with the department within 60 days of the completed test.
Or. Admin. Code § 632-010-0178
Stat. Auth.: ORS 520
Stats. Implemented: ORS 520.095