Or. Admin. Code § 257-100-0035

Current through Register Vol. 63, No. 12, December 1, 2024
Section 257-100-0035 - Statewide Service Center Area Requirement
(1) A manufacturer's representative must maintain a network of certified service centers which must include a minimum of one fixed site service center located in each lettered region, illustrated on the "Oregon IID Regional Map."
(2) A manufacturer's representative must notify OSP within 3 business days if a service center ceases operations. If a service center closure results in failure to meet the regional requirements of the service network, the manufacturer's representative has 120 calendar days to establish a new service center to meet the Service Center Area Requirement. If the manufacturer's representative has not established a new service center in the closed service center region within 120 calendar days of the service center's closure, the manufacturer's representative must have all device models uninstalled in accordance with OAR 257-100-0020 and OAR 257-100-0065.
(3) OSP may revoke certifications for all certified service centers within the manufacturer's representative's network if a manufacturer's representative fails to meet the service center area requirements.
(4) All service centers must be located in the State of Oregon.

Or. Admin. Code § 257-100-0035

TSD 3-2018, temporary adopt filed 09/24/2018, effective 09/24/2018 through 03/22/2019; TSD 2-2019, adopt filed 01/17/2019, effective 01/17/2019; Renumbered from 737-005-0135, TSD 3-2019, filed 05/30/2019, effective 7/1/2019; OSP 24-2019, temporary amend filed 07/03/2019, effective 07/03/2019 through 12/29/2019; OSP 25-2019, amend filed 12/27/2019, effective 12/31/2019; OSP 1-2020, temporary amend filed 04/03/2020, effective 04/03/2020 through 09/29/2020; OSP 3-2022, amend filed 05/20/2022, effective 5/20/2022

Publications: Publications referenced are available from OSP.

Statutory/Other Authority: ORS 813.600 & ORS 813.660

Statutes/Other Implemented: ORS 813.599 - 813.680