Current through Vol. 42, No. 6, December 2, 2024
Section 165:35-43-5 - Public Utility Division consideration(a) PUD shall review and may investigate all reported transmission information for compliance with reporting requirements.(b) After receiving a report from a TOU pursuant to the preceding Section, PUD: (1) Will determine whether the report is compliant with the requirements of the Commission rules; and(2) Inform the TOU of PUD's determination regarding compliance within ninety (90) calendar days of receipt of the report. In the event PUD determines the TOU's report is not in compliance with the rules, PUD shall contact the TOU to require additional information, and such information shall be provided within fifteen (15) calendar days of such notice. If the TOU fails to correct such non-compliance, PUD may reject the report or open an investigation to inquire further into the reported or submitted information.Okla. Admin. Code § 165:35-43-5
Added at 29 Ok Reg 1541, eff 7-12-12Amended by Oklahoma Register, Volume 36, Issue 21, July 15, 2019, eff. 7/25/2019