Minimum Required Safety Valve Capacity in Pounds of Steam/Hour | Steam Boiler Blowoff Piping Valve Size, Inches (Min.) |
Up to 500 | 3/4 |
501 to 1,250 | 1 |
1,251 to 2,500 | 1 1/4 |
2,501 to 6,000 | 1 1/2 |
6,001 and larger | 2 |
N.D. Admin Code 33.1-14-09-20
General Authority: NDCC 23.1-16
Law Implemented: NDCC 23.1-16