A processing facility required to obtain a permit must, in addition to the requirements identified in section 360.19 of this Title, design and operate the facility in compliance with the design and operating requirements in section 361-8.3 of this Part.
N.Y. Comp. Codes R. & Regs. Tit. 6 §§ 361-8.5