N.Y. Comp. Codes R. & Regs. Tit. 6 §§ 227-3.3

Current through Register Vol. 46, No. 45, November 2, 2024
Section 227-3.3 - Permitting requirements and compliance plan submittal
(a) Each facility containing an SCCT subject to this Subpart must have or obtain a permit pursuant to Parts 201 and 621 of this Title that reflects the implementation of the compliance plan required in subdivision (b) of this section prior to the May 1, 2023 compliance date of this Subpart in order to operate on and after the applicable compliance date.
(b) Each facility containing an SCCT subject to this Subpart must submit a compliance plan to the department by March 2, 2020. Each compliance plan must, at minimum, contain:
(1) A list of each SCCT subject to the requirements of this Subpart that includes any identifying numbers such as ORISPL number, emission source number and nameplate capacity.
(2) A schedule outlining how the owner or operator will comply with the requirements set forth in this Subpart including which SCCTs will install controls, controls to be installed, the expected NOx emission rates, SCCTs to be replaced or repowered, and/or SCCTs to be shut down.
(3) A list of renewable resources to be installed under common control of the permittee to be used in the compliance option described in section 227-3.5(b) of this Subpart. This list shall include, for each renewable resource:
(i) location;
(ii) nameplate capacity or equivalent; and
(iii) documentation demonstrating common control.
(4) A list of electric storage resources to be installed under common control of the permittee to be used in the compliance option described in section 227-3.5(b) of this Subpart. This list shall include, for each electric storage resource:
(i) location;
(ii) nameplate capacity or equivalent;
(iii) duration of discharge; and
(iv) documentation demonstrating common control.
(5) Pursuant to section 227-3.2(b)(2)(ii) of this Subpart the entity that owns the emission source asserting control over an electric storage and/or renewable generation resource must provide a letter, as part of a compliance plan or permit modification application, that the bidding and/or dispatch rights have been provided to the entity asserting common control.

N.Y. Comp. Codes R. & Regs. Tit. 6 §§ 227-3.3

Adopted New York State Register December 31, 2019/Volume XLI, Issue 53, eff. 1/11/2020