N.M. Admin. Code § 20.9.10.11

Current through Register Vol. 35, No. 23, December 10, 2024
Section 20.9.10.11 - FINANCIAL ASSURANCE FOR PHASE I & PHASE II ASSESSMENTS
A. Unless suspended from the requirements of 20.9.9.9 - 20.9.9.13 NMAC in accordance with Subsection C of 20.9.9.8 NMAC, the owner or operator shall develop a detailed written estimate, in current dollars, of the cost of hiring a third party to conduct activities of the phase I (20.9.9.13 NMAC) and phase II (20.9.9.15 -20.9.9.16 NMAC) assessments. The phase I and phase II assessments cost estimate shall account for the entire cost of the phase I and phase II assessments for the entire assessment period. This estimated cost should also include estimated costs for an independent project manager and contract administration. The owner or operator shall file a copy of the estimate with the department concurrently with proof of financial assurance and shall notify the department that copies have also been placed in the operating record. The estimate may contain a subsidiary schedule showing the amount necessary to perform a phase I assessment if a release is detected. Should the owner or operator submit a subsidiary schedule, the amount guaranteed annually may be in accordance with this schedule upon approval by the secretary.
(1) During the permit life of the facility and during the post-closure care period, the owner or operator shall annually adjust the phase I and phase II assessments estimate for inflation and any other factors affecting phase I and phase II assessment costs.
(2) The owner or operator shall increase the amount of financial assurance for phase I and phase II assessment costs if changes in the phase I and phase II assessments or facility conditions increase the maximum costs of the phase I and phase II assessments by over three percent of the current financial assurance amounts for phase I and phase II costs.
(3) The owner or operator may reduce the amount of the phase I and phase II financial assurance if the cost estimate exceeds the maximum remaining cost for the phase I and phase II assessments, upon specific approval by the secretary. To seek approval, the owner or operator shall provide a revised cost estimate and supporting documentation to the department. If approved, the owner or operator shall place a copy of the revised cost estimate in the operating record, shall notify the secretary that the estimate has been placed in the operating record and shall file a copy with the department.
B. Unless suspended from the requirements of 20.9.9.9 - 20.9.9.13 NMAC in accordance with Subsection C of 20.9.9.8 NMAC, the owner or operator of each solid waste facility shall secure financial assurance for the costs of phase I and phase II assessments as required under 20.9.9.13 - 20.9.9.16 NMAC. The owner or operator shall provide continuous coverage for the phase I and phase II assessments until released from financial assurance requirements by a written verification issued by the secretary pursuant to Subsection O of 20.9.6.8 NMAC.

N.M. Admin. Code § 20.9.10.11

20.9.10.11 NMAC - Rp, 20 NMAC 9.1.IX.904, 8/2/2007