Current through Register Vol. 35, No. 23, December 10, 2024
Section 20.9.10.10 - FINANCIAL ASSURANCE FOR POST-CLOSURE CAREA. The owner or operator of a solid waste facility shall develop a detailed written estimate, in current dollars, of the cost of hiring a third party to conduct post-closure care for the facility in compliance with the post-closure care plan developed under 20.9.6 NMAC. The post-closure care cost estimate shall account for the total costs of conducting post-closure care, including annual and periodic costs as described in the post-closure care plan over the entire post-closure care period. This estimated cost should also include estimated costs for an independent project manager and contract administration. The owner or operator may submit a subsidiary schedule showing, for the permit life of the facility, the annual incremental acreage and total acreage needing post-closure care and the corresponding estimate of post-closure costs. The owner or operator shall file a copy of the estimate with the department concurrently with proof of financial assurance and shall notify the department that copies have also been placed in the operating record. (1) The cost estimate for post-closure care shall be based on the most expensive costs for care during the post-closure period. Should the owner or operator submit a subsidiary schedule as described in Subsection A of this section, the amount guaranteed annually for post-closure care during the permit life of the facility may be in accordance with this schedule upon approval by the secretary. If the owner or operator, upon inspection, is found to have exceeded the acreage shown on the subsidiary schedule, the subsidiary schedule and the amount of financial assurance shall be increased within sixty days.(2) During the active life of the facility and during the post-closure care period, the owner or operator shall annually adjust the post-closure care estimate for inflation, and any other factors affecting post-closure care costs. The owner or operator shall place a copy of the adjusted estimate in the operating record.(3) The owner or operator shall increase the amount of financial assurance if changes in the post-closure care plan or facility conditions increase the maximum cost of post-closure care by over three percent of the current financial assurance amount.(4) The owner or operator may reduce the amount of financial assurance if the adjusted cost estimate exceeds the maximum cost of care remaining over the post-closure period, upon specific approval by the secretary. To seek approval, the owner or operator shall provide the reduced post-closure care cost estimate and any justification for the reduced estimate in a request to the department.B. The owner or operator of each solid waste facility shall establish financial assurance for the costs of post-closure care in compliance with 20.9.10.13 - 20.9.10.23 NMAC. An originally signed duplicate of each financial assurance document shall be filed with the department. The owner or operator shall provide continuous coverage for post-closure care until released from financial assurance requirements by a written verification issued by the secretary pursuant to Subsection O of 20.9.6.8 NMAC.N.M. Admin. Code § 20.9.10.10
20.9.10.10 NMAC - Rp, 20 NMAC 9.1.IX.903, 8/2/2007