Current through Register Vol. 35, No. 23, December 10, 2024
Section 17.9.588.13 - APPLICATION REQUIREMENTS FOR TYPE 3 PROJECTS Applications for type 3 construction projects shall describe a scope of work that includes
A. a deliverables-based summary of the plan for the grid modernization installation project;B. a description of the grid modernization technology being deployed;C. a completed engineering/design study; andD. proof of compliance with applicable federal, state and local construction requirements.N.M. Admin. Code § 17.9.588.13
Adopted by New Mexico Register, Volume XXXIV, Issue 07, April 11, 2023, eff. 4/11/2023